Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Oct 04, 2022     rt wing bellcrank and top skin support L channel rivet - (1.5 hours)       Category: Wings
Riveted right wing top skin support L channel pieces.
Before riveting the bellcrank support to L Channel I noticed that the edge distance was a bit shy, therefore I drilled two additional holes back a ways but that gets proper edge distance on both the L Channel and the bellcrank support bracket. Cleaned them up and riveted but just to the bellcrank support, not across the skin. I don't want to rivet the top skin to the frame quite yet. The bottom skin will be riveted first and then the top skin nearly very last.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.